One week after the very productive CanSat meeting, the Berlin CanSat team met again at the
Orbitall to work on 3D modelling, the Final Design Report (FDR), programming and preparing the
flight to Portugal.
While researching flight prices we had a few questions, so we contacted the European Space
Agency (ESA) for more information. Whilst we could not proceed with preparing the flight we
consulted about logistics of transporting the CanSat equipment safely from Berlin to Portugal.
We also looked at the exterior design of the CanSat (view image below) and collected more
information relevant for 3D animating the CanSat.
We tested the reach of the antenna and reached one kilometre. A problem emerged with the software
and we worked on fixing it. After about two hours the problem was fixed!